I have a dilemna on how to mount the A pillar and main hoop feet.
From a tech inspector's point of view, what is best practice vs. acceptable here?
Is it better to have full weld around all tubes and only a single mounting of the main hoop/A pillar bar to mount plate? That would be only the one bar itself welded to the mount plate, approx 5.5" of welding length (C=pi*d) with 1.75" tubing.
Main hoop with elevated sill bar.
Final weld would be something like this (except better welder than Photoshop user)
A pillar with elevated sill bar.
Or is it better to sacrifice a small amount of sill bar to main hoop/A pillar weld to be able to weld the sill bar and the main hoop/A pillar tube to the mounting foot all together? This would result in approx 10-12" of weld length along the side of the sill bars and around the main tube.
Main hoop with sill bar along mount plate.
Final weld would be something like this.
A pillar with sill bar along main hoop.
Edited 1 time(s). Last edit at 01/22/2017 10:49AM by rallyser.